Service · quality control
Pre-shipment inspection: check the lot that ships, not the sample
An inspection does not prove your order is good. It proves your order is probably good, to a known level of confidence, on the day it was checked — and it gives you a document to hold the factory to before the container is sealed. Anything that claims more than that is selling you comfort.
Who this is for
- Production is finished and the factory is asking for the balance payment and a loading date.
- You have never seen this factory’s output and the sample you approved was made in a different room.
- Your customer is demanding a report, and “the factory sent photos” will not do.
- You need a pass / rework / fail decision before the goods leave Guangdong.
What I check
- The sampling plan. General Inspection Level II with AQL 2.5 for major and 4.0 for minor defects as the default, critical defects at zero tolerance. I will use your buyer’s standard if they have one — and I will tell you what it means in pieces, because “AQL 2.5” alone is not a number anyone can hold a factory to.
- Quantity and cartons. Units against the order, cartons against the packing list, carton condition, weight and dimensions.
- Product checks. Measurements against the spec, material and finish, colour against the approved sample, function test where the product does something, assembly and accessories, labelling and retail packaging, barcode scan, shipping marks.
- Defect classification. Critical, major, minor — each with a photo and the number of units affected, so the discussion afterwards is about a number and not about adjectives.
- The verdict. Pass, rework or fail, with the specific finding that decided it and what would have to change to flip it.
What lands in your inbox
- A report in English with a five-part structure: header and sampling plan, results table, defect list with photos and counts, verdict, evidence (numbered, dated photographs and video).
- The report on the day of inspection, usually within a few hours of leaving the factory floor.
- A short message for your buyer, if you need one — the same finding in three lines.
Turnaround and how the fee works
Book three to five days ahead so the factory has a fixed date and the goods are actually finished, not “almost finished”. Inspection is one man-day for most consumer-goods lots; the fee is fixed per job and quoted before I go, set by travel, product complexity, lot size and how urgent it is. Re-inspection after rework is quoted separately, and I will tell you honestly when re-inspection is not worth the money.
The sampling logic is worth ten minutes of your time before you book: what an AQL inspection actually covers, and what it does not.
Sampling inspects a sample, not every unit — the maths is in the report. It does not test lifetime, reliability or safety, and it is not a lab certificate: CE, RoHS, REACH or food-contact testing belong with an accredited laboratory, and I will say so rather than pretend otherwise. It also cannot fix a factory that has already decided to ship you the second-best goods.
Questions buyers ask
Which AQL level should I use?
Do you re-inspect after the factory reworks the goods?
Can I join by video call during the inspection?
Can you inspect a factory you have not audited?
Book the inspection before the container is sealed
Send the product, the quantity, the factory address and the date the goods will be finished. You get a sampling plan, a fixed fee and a date within 12 hours.